Rooftop and ground-mounted solar for factories, schools, hospitals and offices. Commercial roofs take four to five weeks to build, industrial ones four to six.
The cost of a unit
The factory next door
may already pay less.
A unit from the grid
₹8.00
A common commercial rate. Yours may be higher.
A unit from your own roof
₹2.76
The plant and 25 years of upkeep, divided by every unit it makes. An estimate.
Power is a cost line you can cut once and keep cut. A business that makes its own units works at a lower cost than one that buys them all.
Use my own rateYour numbers
What will your
roof save?
Tap the electricity bill you pay in a month. You get the size of the system your roof can carry and what it takes off the bill.

Your roof can take up to₹2,00,000off every bill.
- System size
- 209 kWabout 388 panels
- Saved in a year
- ₹24 lakh
- Saved over 25 years
- ₹8.2 crore
- Roof space it needs
- 20,900 sq ft
Worked at ₹8 a unit, a common commercial rate. Fixed and demand charges stay on the bill. We work the exact figure from your own bill.
Thank you, friend.
We have your details. Our team will prepare your 25-year savings report and reach out to you soon.
Who we build for
Six sectors, one way
of working.

Industry
Factories and industries
Sheet roofs and open yards that turn into your cheapest source of power.

Education
Schools and colleges
Buildings that are busiest in daylight, exactly when the roof is producing.

Commercial
Offices, malls, hotels, hospitals
Commercial complexes, laboratories and government offices.

Land
Ground mounting and agrivoltaics
Where the roof is not enough, on open land, with crops growing under and between the arrays.
How long it takes
Weeks, not quarters.
Our own execution times, from the first day on site. We give you the schedule before work begins.
Industrial
4 to 6 weeks
From the start of work on site to switch-on.
Commercial
4 to 5 weeks
Offices, institutions and commercial buildings.
Rural electrification
3 to 4 weeks
Microgrids and community systems.
Residential
1 to 2 weeks
Independent homes, for comparison.

How we work
We design it.
We build it.
We power it.
Engineering
A design that makes the most of the roof area you have.
Procurement
Glass-to-glass and TOPCon panels, the right inverters, galvanized steel.
Construction
Installation and commissioning, with quality checked at each stage.
Operations
Maintenance, monitoring and support for the life of the plant.

Petrichor Solar site photograph
Key project
127.5 kW,
one roof.
Our key project is a completed 127.5 kW rooftop system on a sheet roof in Kukke Subramanya, at the heart of the temple town.
Business
What owners ask.
You can generally install up to 100% of your sanctioned load, subject to approval from BESCOM or your distribution company.
A Power Purchase Agreement is generally signed for 20 to 25 years, which keeps your income or savings from solar stable over that period.
If you revise the load after the agreement is executed, you must inform BESCOM or your distribution company. Whether the old tariff still applies depends on their regulations.
Most residential, commercial and industrial consumers can apply for rooftop solar with net metering, subject to the rules of BESCOM or your local distribution company.
Yes. We offer annual maintenance contracts, regular performance audits, panel cleaning, troubleshooting and system upgrades to keep your system at its best output through its life.