About Us
About Petrichor Solar
Who are we?
About Petrichor Solar
Petrichor Solar is your trusted partners for all Solar Projects. We are specialized in Solar Ground Mounting and Solar Rooftop PV System. We are committed to provide 100% Eco friendly and economically viable Solar solutions. We are always innovative and with our cutting edge technologies available we help our clients to increase their revenue by slashing their monthly electricity bill by 70 to 80%. We empower rural and tribal communities through solar micro grids using available CSR funds and Government subsidies. We are an organization, having backed by in-house team of market and technical experts having vast experience of 30 years.
PETRICHOR is the earthly scent or fragrance produced when rain falls on the dry soil. So the rain is not just a drop of water, but it is the exhibit of emotion of Love and Hope between Sky and Earth through fragrance. The single first rain brings so much of hope in all the plant and creatures on the earth, likewise PETRICHOR SOLAR wants to bring HOPE OF LIGHT in the life of Individuals on your available Roofs through SOLAR INSTALLATION.
How we Do?
Our Work Process
Lead Generation & Collection of Basic data along with Electricity Bill
Site Inspection for Project planning and Costing.
Receive the Purchase Order.
Online Applications for Installation of Rooftop Solar PV System in Government Portal by Paying the Processing Fees.
Obtaining acknowledgement for receipt of applications.
Approval for installation of Rooftop Solar PV System through signing of Nett metering agreement with concerned DISCOM after getting the feasibility report.
Installation of Rooftop Solar PV System.
Work Completion Report to be submitted and apply for the net meter.
Commissioning certificate will be generated from the portal after installing the net meter and inspection by DISCOM.
Once you get the commissioning report, submit the bank account details and a cancelled cheque thorough the portal. If you have applied for subsidy you will receive within 30 days.
Our Projects
Take a Look at our Solar Projects
Coming Soon
We are trusted by more than 250+ happy clients.
We prioritize meeting client needs & ensuring satisfaction, viewing each project as a collaborative effort. Our focus is aiming to reduce expenses while achieving exceptional results.
By prioritizing client requirements and satisfaction while minimizing costs, we ensure a successful and rewarding solar panel installation experience for all parties involved.
Feedbacks from our Clients
Our Happy Client’s Testimonials
Recent FAQs
Do you have any Questions for us?
“Photovoltaic” is composed of two words. “Photo” means Light. “Voltaic” means producing Electricity. When sunlight is used, the relevant term is “Solar photovoltaic”. A photovoltaic (PV) cell, also called as a Solar cell, which is the basic building block, is a device that converts sunlight into electricity.
Many cells put together are known as a module, and many modules assembled together form an array. A PV system consists of an array of modules generating DC electricity, an inverter (which converts D.C energy in to A.C. energy) can be stored in battery storage banks or fed into the Electricity Grid.
Inverter is a device which converts DC power to AC power. There are basically two types of inverters: off-grid inverters and grid tied inverters
A grid tied inverter uses grid voltage as reference for conversion of DC into AC power.
- PV modules
- Grid tied inverters
- Bi-directional meter
- Cables – DC/AC
The SRTPV system, where the inverter uses grid as reference voltage for generation of the solar power and the energy so generated can be exported to the utility grid during non- consumption period.
Solar PV system can be used to power your entire home’s electrical systems, including lights, cooling systems, and appliances.
As per KERC SRTPV Regulation-2016, it is defined as
I. Net-metering: The energy generated by the solar rooftop plant is first allowed for self- consumption and the excess energy is injected to the grid.
II. Gross-metering: The total energy generated by the solar rooftop plant is to be injected into the grid without allowing the generated solar energy to be consumed directly by the consumer.
The life of the Module is 25 years and Inverter warranty is minimum is 5 years or more.
1kW requires 100 sq. ft. shadow free area on the rooftop.
1kW generates average of 4 to 6 units of electricity per day.
The term of the PPA is 25 years
11. Whether all consumers are eligible to install solar rooftop systems to avail net metering facility?
Yes, all the consumers of BESCOM are eligible for net- metering. Only domestic consumers are eligible for both net and gross metering.
Yes. Online application SRTPV -Subsidy-Click Here
SRTPV-Non Subsidy- Click Here
Since, roof rights of the Apartments are not given to the individual consumers, hence not eligible for installation of SRTPV system.
The SRTPV installation can be to put on Common metering installation of the Apartment.
As per the KERC Order dated 15.09.2017, If all the 3 nos. of RR installations are in the same consumer name, then gross metering is allowed up to total sanctioned load/ Contract demand of the building.
In such cases, the PPA shall be executed at 90% of the present tariff.
NO. The new owner of the building has to execute the new PPA at the present tariff. The Old SRTPV PPA has to be terminated.
The maximum capacity is 100KVA*.85(Power factor) = 85kW subject to feasibility of the line.
Any replacement or upgradation of Modules / inverters shall be duly intimated & approved by concerned Sub-divisional officer.
The consumer shall submit the Work Completion report and at any point of time the total installed capacity of SRTPV shall not exceed Sanctioned load of the building
NO. As per KERC order dated:15.09.2017, in case of any revision in the sanctioned load or contract demand of the building the consumer would be eligible for the 90% of the present tariff.
The existing PPA has to be terminated.
As per PPA terms and conditions the work has to be completed within 180 days. In case of any delay the consumer is not eligible for the tariff agreed into the PPA and Supplemental PPA shall be executed the reduced tariff.
As per PPA terms and conditions the SRTPV plant shall be commissioned with 6 months but as the SRTPV Regulation2016 the plant has to be commissioned and synchronized within 180 days.
Hence 180 days is the time period for commissioning and synchronizing the SRTPV plant.