Our Services
Our Services
Our Services
Our Solar Solutions for you
ENGINEERING
Custom solar setups tailored for efficiency and cost savings by skilled engineers.
CONSULTATION
Expert advice on cost analysis, regulations, & system optimization for rooftop solar.
MANUFACTURING
Production of high-quality solar panels utilizing advanced manufacturing techniques.
PROCUREMENT
We handle smooth installation from start to finish, ensuring no hassles for you.
CONSTRUCTION
Expert installation of solar panels ensuring structural integrity and safety compliance.
PROJECT MANAGEMENT
End-to-end management for efficient solar installations within budget and schedule.
Our Sectors
We Provide Our Services to
Schools
Apartment
Villas
Buildings
Industries
Factories
Hospitals
Homes
Our Projects
Take a Look at our Solar Projects
We are Trusted by more than 2000+ Happy Clients.
We prioritize meeting client needs & ensuring satisfaction, viewing each project as a collaborative effort. Our focus is aiming to reduce expenses while achieving exceptional results.
By prioritizing client requirements and satisfaction while minimizing costs, we ensure a successful and rewarding solar panel installation experience for all parties involved.
Feedbacks from our Clients
Our Happy Client’s Testimonials
Recent FAQs
Do you have any Questions for us?
“Photovoltaic” is composed of two words. “Photo” means Light. “Voltaic” means producing Electricity. When sunlight is used, the relevant term is “Solar photovoltaic”. A photovoltaic (PV) cell, also called as a Solar cell, which is the basic building block, is a device that converts sunlight into electricity.
Many cells put together are known as a module, and many modules assembled together form an array. A PV system consists of an array of modules generating DC electricity, an inverter (which converts D.C energy in to A.C. energy) can be stored in battery storage banks or fed into the Electricity Grid.
Inverter is a device which converts DC power to AC power. There are basically two types of inverters: off-grid inverters and grid tied inverters
A grid tied inverter uses grid voltage as reference for conversion of DC into AC power.
- PV modules
- Grid tied inverters
- Bi-directional meter
- Cables – DC/AC
The SRTPV system, where the inverter uses grid as reference voltage for generation of the solar power and the energy so generated can be exported to the utility grid during non- consumption period.
Solar PV system can be used to power your entire home’s electrical systems, including lights, cooling systems, and appliances.
As per KERC SRTPV Regulation-2016, it is defined as
I. Net-metering: The energy generated by the solar rooftop plant is first allowed for self- consumption and the excess energy is injected to the grid.
II. Gross-metering: The total energy generated by the solar rooftop plant is to be injected into the grid without allowing the generated solar energy to be consumed directly by the consumer.
The life of the Module is 25 years and Inverter warranty is minimum is 5 years or more.
1kW requires 100 sq. ft. shadow free area on the rooftop.
1kW generates average of 4 to 6 units of electricity per day.
The term of the PPA is 25 years
11. Whether all consumers are eligible to install solar rooftop systems to avail net metering facility?
Yes, all the consumers of BESCOM are eligible for net- metering. Only domestic consumers are eligible for both net and gross metering.
Yes. Online application SRTPV -Subsidy-Click Here
SRTPV-Non Subsidy- Click Here
Since, roof rights of the Apartments are not given to the individual consumers, hence not eligible for installation of SRTPV system.
The SRTPV installation can be to put on Common metering installation of the Apartment.
As per the KERC Order dated 15.09.2017, If all the 3 nos. of RR installations are in the same consumer name, then gross metering is allowed up to total sanctioned load/ Contract demand of the building.
In such cases, the PPA shall be executed at 90% of the present tariff.
NO. The new owner of the building has to execute the new PPA at the present tariff. The Old SRTPV PPA has to be terminated.
The maximum capacity is 100KVA*.85(Power factor) = 85kW subject to feasibility of the line.
Any replacement or upgradation of Modules / inverters shall be duly intimated & approved by concerned Sub-divisional officer.
The consumer shall submit the Work Completion report and at any point of time the total installed capacity of SRTPV shall not exceed Sanctioned load of the building
NO. As per KERC order dated:15.09.2017, in case of any revision in the sanctioned load or contract demand of the building the consumer would be eligible for the 90% of the present tariff.
The existing PPA has to be terminated.
As per PPA terms and conditions the work has to be completed within 180 days. In case of any delay the consumer is not eligible for the tariff agreed into the PPA and Supplemental PPA shall be executed the reduced tariff.
As per PPA terms and conditions the SRTPV plant shall be commissioned with 6 months but as the SRTPV Regulation2016 the plant has to be commissioned and synchronized within 180 days.
Hence 180 days is the time period for commissioning and synchronizing the SRTPV plant.